HOA Updates 2013-05-10

Fountain Replacement Update

The fountain fountains are projected to ship this Friday (5/10) or Monday (5/13). Shipping may take 5 or so days and once they arrive our vendor will install them within a day or two following depending on the weather.

Algae Bloom

Ongoing treatments are being done. The bloom is a result of run off from fertilizer (not just our neighborhood’s but upstream as well) and warmer temperatures.